Solutions
Drilling solutions by application β each page is a selection guide for one working condition.
βοΈOpen-Pit Mining & Bench Blasting
Bench blasting cost is driven by three numbers β hole diameter, bench depth and rock hardness. Pick those first; the rig and the compressor follow from them.
πͺ¨Quarry & Aggregate Drilling
Quarries rarely drill one hole size β they follow the crusher. Match the rig to the feed size and to how often you move it.
π§Water Well Drilling
The chassis decision drives half the operating cost of a water-well business β choose by terrain, transport distance, well depth and hole diameter.
ποΈDTH Foundation & Anchor Piling
Foundation piling pays for diameter, not depth. Pick the hammer and bit to the pile diameter, then size the rig to the reach.
βοΈPhotovoltaic Pile Driving
Solar farms are priced per pile. Speed per pile and the ability to work across a whole array determine the equipment, not the terrain.
ποΈHigh-Altitude Drilling & Compression
Above 3,000 m, air density falls and every engine loses power. Equipment must be configured for altitude before it leaves the factory.
π°οΈRemote Area & Off-Grid Projects
When there is no grid, service network or road, the equipment must be self-sufficient, easy to repair and simple to transport.
πGeothermal Drilling
Geothermal wells are drilled hot, hard and deep. The rig, the hammer and the air package have to be chosen for temperature and rock, not for headline numbers.
βοΈUnderground Mining & Tunnelling
Inside a drift, the tunnel sets the ceiling for size, height and ventilation. Production drilling is won by machines that fit the section and stay available.
